Project plan¶
This directory holds the plan for alveus: what it will support, how the code is organised, and in which order the work happens. alveus is in the planning stage; no framework code exists yet.
Start with the milestone ladder if you want to know what comes next, or with the scope matrix if you want to know whether a format is planned.
| Page | Answers |
|---|---|
| milestones.md | What is built in which order, and how each step is checked. |
| scope-matrix.md | Which containers, codecs, filters, protocols and hardware APIs are planned, from which specification, at which tier; how far command-line compatibility goes. |
| architecture.md | How the Cargo workspace is split into crates, the interfaces between them, and the rules every crate follows. |
All work follows the clean-room policy in CLEANROOM.md.
Pages still to write¶
These pages complete the plan. Each is written in its own pull request, by a contributor who meets CLEANROOM.md:
- Prior-art survey. Existing Rust media crates with their licence, maturity and provenance, and which of them alveus may depend on or measure against. Ports of C code bases are listed for behaviour only.
- Testing. The conformance manifest format, where each stream set comes from and under which licence, fuzzing budgets, and the black-box tools named in the milestone exit criteria.
- Quality-measurement interface. The frame interface the first consumer in milestone M4 reads.
Changing the plan¶
A change to the plan is a pull request that edits these pages. Moving a row of the scope matrix into or out of tier X, or changing the order of milestones, also needs a decision record under docs/adr/.